Services
From a second set of eyes to full delivery.
Whether you need independent oversight, pre-construction pricing or a general contractor to take a project from permit to occupancy, Westland provides the service model that fits the risk you want to hold.
General Contracting
Single-point accountability for schedule, cost and quality from mobilization to occupancy.
→02Construction Management
Open-book delivery where the owner keeps visibility and control of every trade contract.
→03Design-Build
One contract for design and construction, with a single team accountable for both.
→04Pre-Construction & Cost Control
Budgets, schedules and procurement strategies set before the first excavator arrives.
→05Owner's Representative
An experienced second set of eyes for owners and lenders throughout design and construction.
→06Development & Permit Management
Rezoning and permits managed by a team that has built what it entitles.
→How we deliver
One written process, from first estimate to final warranty walk.
Every Westland project runs on the same documented procedures, so owners know what to expect at each stage regardless of contract type.
- 01
Pre-construction
Define scope, cost and risk before committing.
- Basis of estimate with traceable pricing
- Long-lead items procured against the schedule
- Site operating protocol agreed at kickoff
- 02
Procurement
Engage qualified trades under clear subcontracts.
- WorkSafeBC, insurance and safety prequalification
- Three bids for major scopes, levelled like-for-like
- Owner site rules written into every trade scope
- 03
Mobilization
Start only when contract, permits, safety and systems are in place.
- Signed project startup checklist
- Site-specific safety and emergency plan
- Kickoff plus per-trade pre-start meetings
- 04
Construction
Daily control of safety, schedule, cost and quality.
- Daily reports, photos and field hazard assessments
- Envelope and structural hold points before concealment
- Monthly cost report, schedule update and reconciled draw
- 05
Closeout
Turn over a complete, verified building.
- Internal deficiency walks from about 90% complete
- Commissioning records collected progressively
- Holdback released only after the lien period
- 06
Warranty
One intake point with documented closure.
- Warranty log with photos at intake and closure
- Eleven-month review before the first anniversary
- Walkthroughs before each 2-5-10 coverage milestone