Single-point accountability for schedule, cost and quality from mobilization to occupancy.

As general contractor, Westland takes full responsibility for delivering the building: trade procurement, site supervision, safety as Prime Contractor, schedule and cost. Our procedures are written down, applied on every project, and visible to the owner through regular reporting.

Case studies

General Contracting in practice.

All projects
W68
W68 2
W68 3

Develop & Construct · Completed 2025

W68

Marpole, Vancouver

A mixed-use concrete building in Marpole with 64 homes above retail and office space, developed and built by Westland under one team.

$39M

Construction value

64

Homes

73,000

Square feet

  • Self-performed foundations, formwork and interior finishes
  • Complete site servicing, structure, envelope and MEP coordination
  • Turnover, deficiency correction and warranty administration
View project
The Grey
The Grey 2
The Grey 3

Develop & Construct · Completed 2021

The Grey

Dunbar, Vancouver

A four-storey concrete residential and retail building in Dunbar with two and three bedroom homes over neighbourhood retail.

$26.25M

Construction value

58,830

Square feet

4

Storeys

  • Two and three bedroom homes over neighbourhood retail
  • Owner-side delivery through turnover and deficiencies
  • Post-completion warranty administration
View project

Our approach

How we deliver it, step by step.

  1. 01

    Controlled startup

    Contract, permits, insurance, the site-specific safety plan, the budget baseline and project systems are confirmed before any trade mobilizes. A signed startup checklist closes the gate.

  2. 02

    Baseline and look-ahead scheduling

    A critical-path baseline in Microsoft Project, a rolling two-week look-ahead, and weekly trade commitments tracked against actual progress.

  3. 03

    Qualified trade procurement

    Trades are prequalified on WorkSafeBC standing, insurance, licensing and safety history. Major scopes receive at least three bids where the market allows, levelled on a common scope before award.

  4. 04

    Daily supervision and records

    The superintendent keeps a daily report of manpower, work completed, inspections and delays, with photo documentation of every area before it is concealed.

  5. 05

    Inspection at hold points

    Each project runs an Inspection and Test Plan with hold points before concealment. Mock-ups and first installations set the workmanship standard for the trade.

  6. 06

    Planned closeout and warranty

    Closeout records are collected as work proceeds, deficiencies are verified closed by our own supervision, and an eleven-month warranty review is held before the first anniversary.

What you receive

Deliverables

  • →Baseline schedule and rolling two-week look-ahead
  • →Monthly progress report with milestones, photos, risks and changes
  • →Owner-architect-contractor meeting minutes within two business days
  • →RFI, submittal, site instruction and change registers
  • →Deficiency log by location and trade, with photo evidence
  • →Turnover package: as-builts, O&M manuals, warranties and authority sign-offs

Standards we hold

Controls

  • Prime Contractor duties under the Workers Compensation Act and OHS Regulation
  • No trade mobilizes without an executed subcontract, insurance and WorkSafeBC clearance
  • No changed work proceeds without a signed Change Order or written Change Directive
  • Stipulated price delivery under CCDC 2