Pre-Construction & Cost Control

Budgets, schedules and procurement strategies set before the first excavator arrives.

Pre-construction is where projects are won or lost. Westland prepares estimates with a documented basis, prices risk openly, and identifies long-lead procurement early, then carries the same cost structure into construction so budget and job cost speak the same language.

Case studies

Pre-Construction & Cost Control in practice.

All projects
W19th

Pre-construction & Construction Management · Pre-construction

W19th

Dunbar, Vancouver

A four-storey residential building over ground-floor commercial on the Dunbar corridor.

$15.55M

Budget

28,842

Square feet

  • Constructability review and budgeting
  • Trade market sounding and procurement planning
  • Cost control carried into construction
View project
Urban 5

Pre-construction & General Contracting · Pre-construction

Urban 5

East Richmond, Richmond

Light industrial and office space in an East Richmond employment area.

$12M

Budget

59,000

Square feet

  • Class D to pre-tender estimating
  • Long-lead procurement register tied to the schedule
  • Value engineering with schedule and warranty impacts
View project
Ashcroft Rental

Pre-construction & General Contracting · Pre-construction

Ashcroft Rental

Ashcroft, Ashcroft

Purpose-built rental housing in the Thompson-Nicola region.

$9M

Budget

30,000

Square feet

  • Budget and schedule for an Interior site
  • Trade availability and logistics priced openly
  • Procurement strategy for rural delivery
View project

Our approach

How we deliver it, step by step.

  1. 01

    Site and constraints review

    Existing conditions, access, hazardous materials, servicing, operational and permit constraints are confirmed before design and pricing advance.

  2. 02

    Documented basis of estimate

    Each estimate records its drawing revision, specifications, addenda, exclusions and allowances. Every number traces to a takeoff, a quote or a documented allowance.

  3. 03

    Explicit risk pricing

    General conditions are priced from the schedule duration. Escalation, winter conditions and logistics are priced openly rather than buried in contingency.

  4. 04

    Formal estimate review

    Scope coverage, subcontractor coverage, the risk register, contingency and margin are reviewed at director level before any price is released.

  5. 05

    Long-lead procurement register

    Long-lead items are identified before tender. Submittal approval, order release and delivery are tracked against required-on-site dates.

  6. 06

    Value engineering with trade-offs

    Every savings proposal states its effect on schedule, design intent, quality, operation and warranty. The owner and consultants approve before any substitution.

What you receive

Deliverables

  • →Cost-coded budget and estimate with a written basis of estimate
  • →Trade quotations, a minimum of three for major scopes where possible
  • →Procurement register tied to the baseline schedule
  • →Value engineering options with schedule, quality and warranty impacts
  • →Pro forma and working cashflow for development engagements

Standards we hold

Controls

  • Estimates structured on standard cost codes that transfer directly to job cost
  • Low quotes validated for scope gaps before they are relied on
  • Public tender compliance checklist verified by a second reviewer
  • Scope or fee changes submitted by change notice before costs are incurred